Prefabricated Two Story Medical Clinic
Clinical Solutions
Modular Solutions, Ltd provided a design-build solution using our GSA contract for this multi-story permanent clinical space.
Modular Solutions, Ltd was selected to provide this design-build project for the U S Department of Veteran Affairs (VA) in Los Angeles, CA. Faced with a higher than normal quantity of soldiers returning home from service, the VA had a critical need for behavioral health service facilities. On average at this location, traditional construction tasking was at least a two year time frame. By choosing GSA, and Modular Solutions, Ltd the project was designed, constructed, installed, and occupied in less than 6 months. This state of the art medical facility included sustainable construction, natural lighting, medical examination rooms, treatment rooms, training rooms, and wood floors, accent color walls, and architectural features.
Contact our team today to discuss your next project!