Modular Solutions Case Study in Lake Havasu City

Watch this Modular Solutions case study video of a project in Lake Havasu City, going from parking lot to occupied in 75 days!   When the City needed a permanent modular building for their team a design-build solution was the only option.   Modular Solutions, Ltd was awarded this design-build project based on past performance, existing team, and technical solutions.

Lake Havasu Modular Building Case Study